Roslyn City Meeting Acronyms Glossary
A running glossary of the abbreviations and acronyms that actually show up in City of Roslyn council, commission, and committee minutes — built from real meeting records, not a generic government-jargon list. If you’ve ever tried to search the City’s meeting archive and come up empty because the minutes used “CAC” or “ILA” instead of spelling it out, this page is for that problem. See also the companion WAC/RCW reference page.
If you feel any information on this page is incorrect or out of date, please let us know — corrections are made promptly.
Boards, Committees & Commissions
CAC
Citizen Advisory Committee — oversees management of the Roslyn Urban Forest; appointed by the Mayor, confirmed by Council. City page (archived — city site currently down).
RDA
Roslyn Downtown Association — the downtown merchants’/business association. roslyndowntown.org.
RPHPC / PHPC
(Roslyn) Planning and Historic Preservation Commission — appears both spelled out and abbreviated in meeting reports. Reviews Certificate of Appropriateness applications for properties on the Roslyn Register of Historic Places. City page (archived — city site currently down).
FoRL
Friends of the Roslyn Library — the library’s nonprofit support and fundraising organization, established 1996. roslynpubliclibrary.org.
Meeting & Governmental Process Terms
OPMA
Open Public Meetings Act (RCW 42.30) — governs open meetings, notice, minutes, and executive sessions for Washington public agencies. See our full OPMA/PRA guide.
PRA
Public Records Act (RCW 42.56) — governs public access to government records.
RCW
Revised Code of Washington — the compiled body of permanent Washington state law. See our growing WAC/RCW reference page.
WAC
Washington Administrative Code — regulations issued by executive-branch agencies under statutory authority. See our growing WAC/RCW reference page.
RMC
Roslyn Municipal Code — the City’s own local code (for example, “RMC 18.160” governs Master Planned Developments). Full code text.
PDC
(Washington State) Public Disclosure Commission — oversees campaign-finance and lobbying disclosure. pdc.wa.gov.
ILA
Interlocal Agreement — a formal cooperative agreement between two or more governmental entities under Washington’s Interlocal Cooperation Act (RCW 39.34).
MOU
Memorandum of Understanding — a non-binding or preliminary agreement, often paired with an ILA in council minutes.
State & Federal Agencies
DOE
(Washington State) Department of Ecology. ecology.wa.gov.
EPA
(U.S.) Environmental Protection Agency. epa.gov.
RCO
(Washington State) Recreation and Conservation Office. rco.wa.gov.
DNR
(Washington State) Department of Natural Resources. dnr.wa.gov.
FEMA
Federal Emergency Management Agency. fema.gov.
WSDOT
Washington State Department of Transportation (sometimes appears in minutes as “WASDOT”). wsdot.wa.gov.
AWC
Association of Washington Cities — the statewide municipal association; source of the cost-of-living index the City uses for budgeting, and host of mayor/council training events. awcnet.org.
COG
Council of Governments — the regional association of local governments.
Financial & Budget Terms
EFT
Electronic Funds Transfer — appears on every meeting’s consent-agenda “Checks and EFT” line item.
ACH
Automated Clearing House — electronic payment processing, appears alongside Accounts Payable line items.
AP
Accounts Payable.
ARPA
American Rescue Plan Act — federal COVID-era relief funding. U.S. Treasury program overview.
TIP
Transportation Improvement Program — a local agency’s state-required 6-year transportation project list (RCW 35.77.010).
CD
Certificate of Deposit — a bank investment instrument.
Development, Land Use & Environmental
NFA
No Further Action (letter) — a Department of Ecology sign-off confirming site cleanup is complete, often a prerequisite before development can proceed. Ecology’s NFA program page. Relevant to the Forterra #4 Mine site.
I&I
Inflow and Infiltration — a sewer-system engineering term for unwanted groundwater/stormwater entering sanitary sewer lines.
LOMR
Letter of Map Revision — a FEMA flood-map amendment process. FEMA LOMR/CLOMR page.
GMA
Growth Management Act (RCW 36.70A) — Washington’s land-use planning law.
ADU
Accessory Dwelling Unit — governed citywide by RMC Chapter 18.140 (Accessory Uses).
SEPA
State Environmental Policy Act — Washington’s environmental review law, implemented locally under RMC 18.40. Determines whether a project needs an environmental checklist, an Environmental Impact Statement (EIS), or neither. WAC 197-11-920 designates which state agency reviews each impact category — including DAHP for archaeological/historical impacts. Bundled automatically into Master Planned Development review (RMC 18.160.090) for large parcels. Ecology’s SEPA Register.
DAHP
(Washington State) Department of Archaeology and Historic Preservation — prepared Roslyn’s 1978 National Register nomination and runs the Certified Local Government program; also the state agency designated under WAC 197-11-920 to review archaeological/historical impacts during SEPA. dahp.wa.gov.
DNS
Determination of Nonsignificance — a SEPA (State Environmental Policy Act) finding that a project’s environmental checklist review shows no significant adverse impact, so a full Environmental Impact Statement (EIS) isn’t required. Directly relevant to the Forterra #4 Mine site review process. Search Ecology’s SEPA Register.
Utility & Public Safety
PSE
Puget Sound Energy — the regional utility serving Roslyn. pse.com.
PSPS
Public Safety Power Shutoff.
PW
Public Works.
Vehicles
Covered in depth on our UTV/ATV/SxS legalization page.
WATV
Wheeled All-Terrain Vehicle.
UTV
Utility Terrain Vehicle.
ATV
All-Terrain Vehicle.
SxS
Side-by-Side.
